1.
Amir Razaq. Commissioning Failures in Integrated Life Safety Systems (FA + HVAC Shutdown + Elevators): A Multi-Site Case Study Based on Field Testing and Authority Inspections. American Journal of Data Science and Analytics [Internet]. 2024 Dec. 8 [cited 2026 Jul. 4];5(12):280-313. Available from: https://ajdsa-journal.org/index.php/ajdsa/article/view/45