(1)
Amir Razaq. Commissioning Failures in Integrated Life Safety Systems (FA + HVAC Shutdown + Elevators): A Multi-Site Case Study Based on Field Testing and Authority Inspections. American Journal of Data Science and Analytics 2024, 5 (12), 280-313. https://doi.org/10.63125/nst5ee49.